Safety in high-rise construction: The rail-guided MGC climbing system is the ideal solution for wall and slab works at great heights. Assembly on the grounds adds to the safety benefits. All-round worker protection through closed housing, remains anchored to the building throughout the building process.
Modular system for climbing and screens
Always anchored to building, also when climbing
Completely surrounded by screens
Secondary platforms can be attached to any guiding profile
Integrated ladder system for finishing work
Assembly at ground level and in line with the building progress
Free positioning of guiding profiles up to a width of 4,50 m
Simple to lift using guiding profiles
Safe work independent of any wind load
Al Mankhool is located in western Dubai and crossed by Al Mankhool Road, also referred to as Bank Street.
The MEVA MGS and MGC systems being hydraulically climbed up the WINX Tower in Frankfurt am Main, Germany. This saves crane and waiting time.
Gravity walls to the tunnel entrance, up to 14 m high,poured using a single-sided adaptation of the MGC guided climbing system and Mammut 350 wall panels.
A new transit camp project is taking shape in the Anjirwadi district in the city of Mumbai. The high-rise tower, built with MEVA Formwork Systems, will function as a temporary housing for the residents of Bhendi Bazar. The accommodation will be provisional and free of charge for the duration of 15 years while clusters 3A and 3B are being built.
The tower is being built with the hydraulic automatic climbing system MAC, MEVA Mammut 350 and MGC.
The shafts are being climbed with Mammut formwork panels placed on MGC climbing platforms on the outside and on shaft platforms on the inside.
Three tieing methods in one system. The sytem‘s integrated Combi tie of using any of the following tieing methods and flexibly changing from one to another:
Rail guided climbing system MGS. Lifted by crane or hydraulic ram. Optimum safety system for climbing and slab works in high-rise construction, matched to slab system MevaDec
MEVA automatic, hydraulic climbing system for cores and shafts in high-rise construction. Optimum worker safety through closed housing.
Heavy-duty wall formwork. Large panel size 3.50 high, 2.50 width footprint. 100 kN/m² concrete load capacity throughout the system.
AluStarTec is a true multi-purpose formwork system comprising a light-weight aluminium panel family and a large-format panel range.