Frames made of closed high-strength hollow steel profiles
High-quality ACC protective coating technology
Concrete load capacity is 100 kN/m² according to German standard DIN 18218
Four identical panels with articulated links
Integrated and ready-mounted ladder, safety cage and access platform
With chamfer strip or sealing tape for sharp-edged columns
Perforated rail with increments of 5 cm and indication of measurements for column sections from 20 to 60 cm
Standard units 270 cm and 360 cm high; height extension by adding 60 cm or 120 cm extension units below standard units
Standard and extension panels are connected with normal AS/ST assembly locks
Integrated spanners and safety pins
Transport wheels can be mounted
All-plastic facing alkus, no swelling or shrinking
Easy repair of scratches or drill holes etc. on site with the same polypropylene material
Screwable and nailable without chipping off of top layer
The alkus facing lasts as long as the Frame
As with many areas in the United Arab Emirates, Sharjah is growing rapidly.
Large building site in the Bavarian town of Regensburg, where work on the new Bavarian Museum of History is in full swing.
American Concrete Institute (ACI) and ASCC representatives visit construction site andMEVA headquarters in Haiterbach for talks
Safety is top priority on the site: all-around fall-down protection plus safe ladder access on MEP shoring towers as well as column formwork with integrated working platform and a fixed ladder with safety cage.
MEVA KHK in Dubai were consulted to design and provide a comprehensive formwork solution for the island´s large-scale infrastructure projects.
Logistische Herausforderung beim Neubau der Rathaus-Galerie in Hagens Innenstadt mit Tiefgarage, Bau und Abriss laufen parallel, Baumaterial und -gerät wird über eine einzige Rampe angefahren, Innenstadtbetrieb bleibt unberührt, auch dank MEVA reibungsloser Baufortschritt und hohe Qualitätsstandards gewährleistet.